Champe Round Chandelier Replica

Champe Round Chandelier Replica

Product Code: AMP369
Availability: Made-to-order
$1,229.00
Ex Tax: $1,117.27

Available Options

Bulb Options: *
Size: *
Qty:
 
Shipping Estimate
**Applies to this product only
Country:
Region / State:
Post Code:

Specification

Home Lighting
Product Code AMP369
Color Copper
Dimensions Small 8 heads: φ920*H180 mm; Large 10 heads: φ1220*H180 mm
Material & Finishes Copper and Black
Bulb Type 8 heads: GU10*8; 10 heads: GU10*10
Bulb Included No

Description

- This design maintains the clean and sleek lines inherent in the concept, but sets the form in a new context.

- Crafted of solid brass tubing with cast brass turnings and fittings;

- Options for eight or ten light heads, GU10 twist-and-lock base bulbs;

Bulbs not included (Sold Separately);  

- If brighter light is preferred, consider an LED bulb with a higher lumen output;  

- Suitable for use indoors in dry locations not directly exposed to excessive moisture and water;

- Installation: Hardwire; Assembly required; Professional installation is required; 

- Care: Wipe with a soft dry cloth; avoid the use of all cleaners and abrasives, as they will damage the finish.

Delivery

We deliver Australia-Wide via premium carriers. All services make deliveries between Monday and Friday during business hours. We also welcome international orders. To find out more details, please contact us at: sales@amonsonlighting.com.au

Authority to Leave (ATL)

If you are comfortable to have your goods left at your door, you can advise us that in the comment section at check out. However, please note with all ATL deliveries, we take no responsibility for missing goods.

Shipping Times

For items that are in stock, delivery times will be as below:

Capital Cities Remote Area
VIC 1-2 business days additional 1-3 business days
NSW 2-3 business days additional 3-5 business days
ACT 2-3 business days additional 3-5 business days
SA 2-3 business days additional 3-5 business days
QLD 2-4 business days additional 3-5 business days
WA 3-6 business days additional 3-5 business days
TAS 3-6 business days additional 3-5 business days
NT 5-10 business days additional 3-5 business days

For made-to-order items, there will be an 6-8 weeks lead time for production. For custom-made items, lead time could take up to 12 week.

Reviews (0)

Write a review

Your Name:
Your Review: Note: HTML is not translated! Rating: Bad           Good

Enter the code in the box below: